Packed up & ready to go
January 23, 2018
We're off to London again and this time we are taking the High Powered Vibrocorer and the Piston Corer. Its all packed on the back of the lorry along with our trusty container ( control centre) for deployment on the Thames this week as part of the Tideway construction.
Our two Dans are operating the equipment this week and praying for a little less mud than they found last time they worked on the Thames... but we are not optimistic!
A busy week ahead before a quick turn around to switch equipment and re load the Datem Neptune 5000 CPT for our next job in London.
At least we get some fabulous pictures of London as a bonus !